(no subject)
Aug. 20th, 2009 06:10 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
TUESDAY-WEDNESDAY
The ground was dry enough Tuesday so I got the lawn mowed and just in time too as we've had more rain come through.
Worked steadily on The Project and finally got it to the point that it can be put to use this weekend although I'll probably take it back to rebind it as there's already a three inch failure along one side of it. I'll have to find some black silk to remake the binding wider. Aside from the binding I'm very pleased with the results of this project and I can't wait to see the response to it.
I went and got my hair cut Wednesday afternoon and stopped at Hancocks for wide cotton twill tape and mosquito netting for the silk tent divider. This probably won't be ready to use this weekend as I still have to much to get done first..
The ground was dry enough Tuesday so I got the lawn mowed and just in time too as we've had more rain come through.
Worked steadily on The Project and finally got it to the point that it can be put to use this weekend although I'll probably take it back to rebind it as there's already a three inch failure along one side of it. I'll have to find some black silk to remake the binding wider. Aside from the binding I'm very pleased with the results of this project and I can't wait to see the response to it.
I went and got my hair cut Wednesday afternoon and stopped at Hancocks for wide cotton twill tape and mosquito netting for the silk tent divider. This probably won't be ready to use this weekend as I still have to much to get done first..